WELCOME TO SHIPSPOTTING.COM
Description:
A gantry crane manufactured in Finland was delivered at Montoir container Terminal (France) on 14 August. Towed by the tug KRAFT, the barge SCANBARGE and its 55 m. height container successfully cleared the Saint-Nazaire bridge (60 m.) at low water.
Former name(s):
- Scanbarge 1 (Until 2002 Apr)
- T Barge 2 (Until 1995 Dec)
- Eide Barge Viii (Until 1990 Nov)
- Rough Sea Barge 10 (Until 1990 Jun)
There is no AIS Position Data available for this ship!
Would you like to add AIS Coverage?
Add AIS Coverage1 photos
19 photos
1 photos
3 photos
1 photos
8 photos
COMMENT THIS PHOTO(0)