WELCOME TO SHIPSPOTTING.COM
Description:
30/11/2018, arriving at the anchorage of Las Palmas de Gran Canaria, Spain.
For bunkering, during a voyage from drydocking at Zhoushan, China (departed 11/10/2018), loading a full cargo of coal at Bunati Offshore Port, Indonesia (departed 25/10/2018), and scheduled to discharge cargo at Rotterdam, Netherlands.
Keel laid on 08/12/2010, launched on 20/03/2012 and completed on 27/06/2012 by Koyo Dockyard Co., Mihara, Japan (2318)
92,752 g.t. and 181,415 dwt., as:
'Navios Obeliks'.
https://www.navios.com/Fleet/
This ship exists in the following categories:
Bulkers built 2011-2020 - 7 photos
COMMENT THIS PHOTO(0)