WELCOME TO SHIPSPOTTING.COM
Description:
Vigo, Spain; September 14, 2019;
vessel (originally named Azora) under construction at shipyard, Vigo, Spain;
Hijos de J. Barreras shipyard being built for the Ritz Carlton Yacht Collection;
the five-star hotel brand will launch three "small", ultra-luxury ships with laid-back
itineraries and spacious, open-concept design schemes;
this maiden vessel was scheduled to pull out of the shipyard late in 2019, with bookings
opening next May, marking the first time that a hotel company hits the high seas;
lenght: 192 m, passenger capacity: 298, 149 suites and 2 penthouse maximum luxury
of 138 m2 each;
Ritz-Carlton Y.C. had previously announced that the ship would be called Azora,
but problems in registering the name have forced this change;
registration request was made in May 2019; if there is no opposition, it will be awarded
on October 17;
there are currently no references to Azora on the website of The Ritz-Carlton Y.C. but
the name Evrima appears on the Barreras website
www.elrincondeltripulante.xyz/2020/07/the-ritz-carlton-holder-of-100-of.html?fbclid=IwAR153pyuBBOQD6le5qOlUQGoTgUSVhCJppojWThCAcrB578cRH2aG88f0LE
This ship exists in the following categories:
Ships under Construction - 28 photos
Cruise Ships and Liners built 2021-2030 - 39 photos
3 photos
4 photos
1 photos
2 photos
4 photos
4 photos
Jose Ricardo Rodriguez Montero
2 photos
2 photos
8 photos
5 photos
3 photos
1 photos
1 photos
1 photos
2 photos
3 photos
2 photos
1 photos
1 photos
2 photos
5 photos
1 photos
4 photos
4 photos
1 photos
COMMENT THIS PHOTO(8)
Edit
comment
Edit
comment
cheers,
dirk septer
Edit
comment
rgds
Edit
comment
Edit
comment
dirk septer
Edit
comment
Currently mired in protracted contractual differences between the owner and builder.
Six months behind schedule and with an expected completion date of 05/05/2020 (if negotiations don't sink the company & the completion of the vessel) and with a final price expected to be 290 million euros.
More in Spanish:
https://www.puentedemando.com/barreras-aplaza-seis-meses-la-entrega-del-megayate-azora/
Edit
comment
Edit
comment