WELCOME TO SHIPSPOTTING.COM
Description:
Displ: 16,082 tons full load
Dim: 721 x 73 x 30 ft
Prop: Steam turbines, 2 C1W reactors, 2 shafts, 80,000 hp, 30 knots
Crew: 858
Arm: 1 twin Talos (52 missiles), 2 twin Terrier (120 missiles total), 1 ASROC, 2 5/38, 6 12.75 inch TT
CLGN 160/CGN 160/CGN 9 Long Beach Built by Bethlehem Quincy. To CGN 160 6 Dec 1956, laid down 2 Dec 1957, to CGN 9 1 July 1957, launched 14 July 1959, commissioned 9 Sept 1961. Refuelled at Mare Island Navy 1971-1972. Proposed reconstruction with Aegis and all superstructure replaced cancelled 12/76. Talos deactivated 1978, removed 1979. Updated/rebuilt at Puget Sound Navy 6 Oct 1980 to 26 March 1983; superstructure modified and phased-arrays removed. 8 Harpoon missiles and 2 Phalanx CIWS added during the reconstruction; 2 Tomahawk ABLs added 1985. Stripped at Newport News starting 5/94, to In Commission, In Reserve 7 July 1994, stripping complete 1 May 1995. Decommissioned and stricken 1 May 1995. All superstructure, weapons, electronics removed. Hulk towed to Bremerton April-May 1996.
I took this photograph during September of 2003.
There is no Ship Data available for this photo!
Would you like to suggest new Ship Data?
This ship is not assigned to any other category.
COMMENT THIS PHOTO(0)