WELCOME TO SHIPSPOTTING.COM
Description:
June 6, 2009, tug ECOSSE pulling and bigger tug MARY E. HANNAH pushing barge CBC 4507 carrying a load of 875,000 pounds preparing to enter firs door Beauharnois locks on the St-Lawrence Seaway near Montreal; very risky task; that big kind of boiler used in distilliation process was built in Spain then ship by boat to Montreal port; there they put that thing on a barge to an unknow destination????. It is the biggest product that ever transit through the Montreal Maritime Installation.It takes 7 minutes to raise ships 42 feets to be at the same level as the second door of the locks
There is no Ship Data available for this photo!
Would you like to suggest new Ship Data?
This ship is not assigned to any other category.
COMMENT THIS PHOTO(0)