WELCOME TO SHIPSPOTTING.COM
Description:
11/02/1980, Mitsui No.2 Building Dock (500,000 dwt. capacity), Ichihara City, Chiba, Japan.
Main engine, one B&W 12L90GFC, developing 40,350 bhp / 30102kW.
Keel laid on 03/08/1978, floated out on 02/03/1980 and completed on 01/06/1980 by Mitsui, Chiba, Japan (1113)
188,728 g.t. and 360,700 dwt., as:
'Berge Pioneer' to 2004,
'Belokamenka' until sold to India for demolition, and renamed
'Bell' for the delivery voyage.
Arrived at Alang on 17/05/2019.
+++++++++++++++++++++++++++++
Converted at Dubai Drydocks in 2004 to a FPSO and used as an oil storage hulk at Murmansk from February 2004 onwards.
Former name(s):
- Berge Pioneer (Until 2003 Dec)
There is no AIS Position Data available for this ship!
Would you like to add AIS Coverage?
Add AIS CoverageThis ship exists in the following categories:
Ships under Repair or Conversion - 3 photos
Ships under Construction - 3 photos
Floating Production/Storage/Offloading Units - 13 photos
Tankers built 1970 - 1980 - 1 photos
1 photos
6 photos
3 photos
1 photos
1 photos
4 photos
3 photos
1 photos
COMMENT THIS PHOTO(0)