WELCOME TO SHIPSPOTTING.COM
Description:
21/11/2023, MAN Energy Solutions berth, Port of Las Palmas de Gran Canaria, Islas Canarias, Spain.
The vessel had arrived from Kamsar, Guinea, earlier that day.
This Danish owned cargo vessel was in port for quite some time.
Initially at this berth, the 'MAN Energy Solutions' repair berth for, I assume engine repairs.
https://jpship.dk/fleet-list-2/
The vessel then entered the Zamakona drydock area on 23/11/2023, before returning to the MAN berth on 16/12/2023.
Unusually, she returned to the drydock again on 23/12/2023.
Keel laid on 30/06/1994, launched on 26/08/2008, and completed on 15/05/2009.
Casco/hull built by ATG Giurgiu, Giurgiu, Romania (690).
Completed by Bodewes, Hoogeszand, Netherlands (690)
3,199 g.t. & 4,409 dwt.,
launched as:
'Vechtetal', to 2009, and
'Sun Bird' since.
This ship exists in the following categories:
Ships under Construction - 10 photos
General cargo ships built 2000-2010 (Over 3000gt) - 47 photos
4 photos
5 photos
2 photos
1 photos
3 photos
2 photos
1 photos
2 photos
2 photos
2 photos
3 photos
1 photos
1 photos
5 photos
1 photos
4 photos
3 photos
2 photos
2 photos
2 photos
2 photos
2 photos
1 photos
4 photos
COMMENT THIS PHOTO(0)