Between the wind turbines which will be placed on the Thorntonbank a 36 kV cable network will be laid with a total distance of 50,75 km for transportation of the power that is generated to the offshore transformer platform.This will be done by this platform, here pulled by the ENSOR tug. OSTEND, Belgium 07/08/2007.