A new type of "budget VLCC" tanker, where "forward part is optional". :)
"Tandem launching" at Daewoo shipyard.
This ship exists in the following categories:
Ships under Construction - 4 photos
Tankers built 2011 - 2020 - 2 photos
1 photos
5 photos
COMMENT THIS PHOTO(8)
Edit
comment
Now, however, I see that there is a difference between "building a ship in two halves" and what I am witnessing now going on at Daewoo: while they do build the aft half and launch it, after they put it back into the construction dock they just continue adding hull blocks, so there is no forward half waiting to be joined with her aft sister...
Frank, I will upload her side view so we can have a better look at the size of her funnel...
Cheers
Vlad
Edit
comment
Edit
comment
Edit
comment
Thanks for the good wishes, Jens, I hope you had a great Easter!
Cheers
Vlad
Edit
comment
Happy Easter Vlad.
Cheers,
Jens
Edit
comment
Here at Daewoo, the size of their "Dry dock No. 1" allows for the construction of two full-sized VLCCs side by side, plus two halves. The other dry dock has similar length, but is narrower, so it allows "one and a half" ship.
Cheers
Vlad
Edit
comment
Edit
comment